Welcome to our case study section. Please contact us if you have any query or would like to discuss a specific project.

Equine Veterinary Hospital, Hampshire (September 2005)
Design Data Plant Equipment Equine Veterinary Hospital completed installation
Daily flow (m3/day): 17.0 EnSo plant: Ocean 150/6
BOD load (kg/day): 9.0 Other: existing 16m3 tank
Ammonia load (kg/day): 0.5  
Effluent target:
20:30:10  

Housing Estate in the village of Cumrew, Cumbria (August 2005)
Design Data Plant Equipment Cumrew housing estate installation
Daily flow (m3/day): 11.6 EnSo plant: Ocean 75/4
BOD load (kg/day): 3.5
Other: none
Ammonia load (kg/day): 0.5    
Effluent target:
20:30:20    

Drive-through Fast Food Outlet, West Sussex (July 2005)
Design Data Plant Equipment Fast food outlet installation
Daily flow (m3/day): 8.0
EnSo plant: Ocean 150/6
BOD load (kg/day): 7.8
Other: pump station
Ammonia load (kg/day): 1.9
   
Effluent target:
20:30:10